7
7
- 142
Mini ECO-i System
Remote Control Functions
9. LonWorks Interface Product Manual
(SHA-LN16UG(B))
4. LonWorks Interface Test Run
Before performing a test run of the LonWorks Interface, perform
test runs of the A/C units and assign central control addresses for
A/C units.
[LonWorks Interface Test Run Procedure]
(1) Press and hold touch-switch S001 on the main circuit board for 5
seconds or longer.
Test run mode is enabled for the main circuit board that is
currently being controlled. LD001 illuminates, and LD002 –
LD008 turn off.
(2) Press touch-switch S002. The data LEDs appear as shown in the
tables below.
In addition, the assigned indoor unit groups start and stop as
shown in the tables below.
(3) Be sure to reset the power after the LonWorks Interface test run
is completed.
1
2
Data
3 4 5 6 7 8
1
2
Data
3 4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
Stop
Stop
Stop
Stop
STEP 1
S002 PUSH
1
2
Data
3 4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
Start
Stop
Stop
Stop
STEP 2
1
2
Data
3 4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
Start
Start
Stop
Stop
STEP 3
1
2
Data
3 4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
Start
Start
Start
Stop
STEP 4
S002 PUSH
S002 PUSH
S002 PUSH
S002 PUSH
S002 PUSH
1
2
Data
3 4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
Start
Start
Start
Start
STEP 5
1
2
Data
3 4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
STEP 1
LD
COM
COM
COM
COM
COM
COM
COM
Stop
Stop
Stop
Stop
06-408 Mini_ECOi_SM7 11/10/06 7:24 PM Page 142
获取更多资料
微信搜索蓝领星球