1-15
Safety Functions
Recovery Processing
If power outage occurred or otherwise the power was cut off during processing and the processing stopped,
recovery processing is performed once the system recovers.
The following operations are performed:
• Defrost • Manual ozone cycle • Cleaning operation
• Manual shutdown
• Automatic shutdown
Summary of Contents for Tissue-Tek Polar DM
Page 1: ...Operating Manual Frozen Tissue Section Preparation Instrument Cryostat Microtome...
Page 15: ...Chapter 1 Basic Knowledge of Instrument...
Page 32: ...1 17 Standard Accessories Options 4 5 15...
Page 68: ...1 53...
Page 69: ...Chapter 2 Operating Method...
Page 108: ...2 39...
Page 109: ...Chapter 3 Maintenance Inspection...
Page 122: ...3 13...
Page 123: ...Chapter 4 Troubleshooting...