147
Unless stated otherwise, all dimensions are given in mm.
MANTO®
Three different MANTO Column Frame panels are available.
1100
600
900
600
300
300
h = 2.70 m
1100
600
900
600
600
300
300
300
300
300
300
600
1100
h = 1.20 m
1200
1100
600
900
600
300
300
300
300
300
300
600
1100
h = 0.60 m
1100
The available tie positions of the panels can be seen in the typical horizontal section
shown below.
57
Pattern
14 x 50 = 700
27
1100
276
The panels are connected with a MANTO Tie Nut and an S-Bolt.
Column formwork of 2.70 m requires 16no. S-Bolts and 16no. MANTO Tie Nuts. An
extension of 1.20 m requires 8no. S-Bolts and 8no. MANTO Tie Nuts. An extension of
0.60 m requires 4no. S-Bolts and 4no. MANTO Tie Nuts.
325
13
S-Bolt
(code:479724)
MANTO Tie Nut
(code:464600)
The form sheets must be fixed to the panels before the panels are tied.
Attaching plywood sheet
The plywood sheet can be screwed or nailed onto the nailing strip or screwed from the
rear through the tying profile. There are also fasteners at the upper and lower edge
profile of the MANTO Column Frames.
Plywood 21 mm
Plywood screw or
screw nail
6 mm x 60 mm
Nailing strip
Tying profile
Summary of Contents for Huennebeck MANTO G3
Page 1: ...MANTO Large frame panel formwork User guide...
Page 9: ...9 Unless stated otherwise all dimensions are given in mm MANTO...
Page 61: ...61 Unless stated otherwise all dimensions are given in mm MANTO MANTO G3 M MANTO G3 M...
Page 219: ...219 Unless stated otherwise all dimensions are given in mm MANTO...