205
Unless stated otherwise, all dimensions are given in mm.
MANTO®
18 Stripping
Step 1
Remove loose items from the formwork.
Step 2
Attach the MANTO Crane Adapter (A) to the closing side of the formwork (opposite the
MANTO Pouring Platform).
Step 3
Remove all ties (B) connecting the part of the formwork to be removed.
Step 4
Release the closing formwork from the wall. Lifting can now start.
Closing formwork
max. 60°
A
A
B
B
B
B
B
B
B
B
WARNING
Risk of injury from overturning formwork!
Attach the closing formwork to a crane before removing the ties.
When lifting MANTO panels using 2no. lifting points, the internal angle of the crane
slings should not exceed 60°.
Step 5
Clean the formwork to remove the remaining concrete.
Summary of Contents for Huennebeck MANTO G3
Page 1: ...MANTO Large frame panel formwork User guide...
Page 9: ...9 Unless stated otherwise all dimensions are given in mm MANTO...
Page 61: ...61 Unless stated otherwise all dimensions are given in mm MANTO MANTO G3 M MANTO G3 M...
Page 219: ...219 Unless stated otherwise all dimensions are given in mm MANTO...