![Ross Synergy 1 Maintenance Manual Download Page 84](http://html1.mh-extra.com/html/ross/synergy-1/synergy-1_maintenance-manual_1489025084.webp)
4–14 • Option Boards
Synergy 1 and Synergy 100 Maintenance Guide (v16-S1)
8. Insert and tighten the 2 screws, taking care not to over tighten them. Refer to the
following diagram:
Fan Assembly Synergy 1 Frame
9. When complete, carefully replace the
Synergy 1 Frame
Processor
Board
into the
frame, and secure with the outer latches on the board edges.
This completes the procedure for installing the
Squeeze & Tease 3D/WARP Fan
Assembly
on the
Squeeze & Tease 3D/WARP
card within the Synergy 1 frame. Please contact Ross Video Technical
Support if any further assistance is required. Next you will upgrade the Squeeze & Tease software.
Squeeze & Tease Software Upgrade
The
Squeeze & Tease 3D/WARP
board has its own CPU and, therefore, requires its own software.
The
Squeeze & Tease 3D/WARP
board will come preloaded with the latest version of software from
Important
If you have purchased the
Squeeze & Tease 3D/WARP
option, you
must upgrade the software on the
Squeeze & Tease 3D/WARP
Board
as well.
Note
Remember to upgrade your switcher software to the same version as
the
Squeeze & Tease 3D/WARP
software before you begin. The
switcher software
must
be upgraded
before
attempting to upgrade
Squeeze & Tease 3D
.
Version 11 software requires the 3D fan assembly be in place before
you upgrade. Refer to the section “
Installing the 3D Fan Assembly
on page 4–12 for details. If you do not have the
3D Fan Assembly
,
please call Ross Video Technical Support.
3/8’’ Screws
Hex Standoffs
(Thread into mounting
holes MP1 and MP2)
Cable Assembly
Summary of Contents for Synergy 1
Page 1: ...Ross Video Limited Synergy 1 and Synergy 100 Maintenance Guide Software Version 16 S1...
Page 10: ......
Page 16: ...vi Contents Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 24: ...1 8 Introduction Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 70: ...3 24 Software Upgrades Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 108: ...5 12 Frame Processor CPU Board Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 122: ...6 14 Working with Installed Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 142: ...8 14 Power Supplies Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 172: ...9 30 Calibration and Diagnostics Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 186: ...10 14 Control Panel Boards Synergy 1 and Synergy 100 Maintenance Guide v16...
Page 230: ...13 20 Miscellaneous Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 240: ...IX 10 Index Synergy 1 and Synergy 100 Maintenance Guide v16 S1...