Synergy 1 and Synergy 100 Maintenance Guide (v16-S1)
Software Upgrades • 3–5
Frame Jumpers and Switches
The following diagram illustrates the location of jumpers and switches on the front edge of the
Frame
CPU Board
:
Frame Jumpers and Switches
1. Reset Button
Press the red
RESET
button on the frame to initiate a
full system
reset. When the reset is
initiated from the frame, the control panel’s reset is initiated using a software message
that is passed along the RS-422 control cable. In the unlikely event that the control panel
has crashed, it may be necessary to
manually
reset the control panel. Refer to the section
”on page 3-7 for additional information.
2. DIP Switch 1
This 8-position DIP switch is reserved for future use. Please leave all switches in the
default
Down
position, as labeled on the switch. (Early issue boards may find this
switch unpopulated).
3. DIP Switch 3
This 8-position DIP switch is adjusted only when upgrading Squeeze & Tease
3D/WARP software on the Synergy 1 panel and frame. In that case, set SW8 in the
Up
position to enable Squeeze & Tease 3D/WARP software upgrades from a floppy disk or
USB key. Refer to Chapter 2, “
Installation and Setup
” of your
Squeeze & Tease
3D/WARP Owner’s Guide
for detailed switch setup instructions.
If no Squeeze & Tease 3D/WARP software upgrades are being performed, please leave
all switches in the default
Down
position, as labeled on the switch.
4. DIP Switch 2
This 8-position DIP switch is reserved for future use. Please leave all switches in the
default
Down
position, as labeled on the switch.
Caution
Static discharge can cause serious damage to sensitive semiconductor
devices. Avoid handling the switcher circuit boards in high static
environments such as carpeted areas and when synthetic fiber clothing
is worn. Touch the frame to dissipate static charge before removing
boards from the frame and exercise proper grounding precautions
when working on circuit boards.
1) Reset Button
2) DIP Switch 1, Reserved
3) DIP Switch 3, S&T 3D Upgrade
4) DIP Switch 2, Reserved
5) DIP Switch 4, Active
6) Watch Dog Jumper
Frame CPU Board
WATCH
DOG
2
6
RESET
3
DIP SW1
DIP SW3
DIP SW2
4
DIP SW4
1
5
Rear of Frame
Front of Board
Summary of Contents for Synergy 1
Page 1: ...Ross Video Limited Synergy 1 and Synergy 100 Maintenance Guide Software Version 16 S1...
Page 10: ......
Page 16: ...vi Contents Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 24: ...1 8 Introduction Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 70: ...3 24 Software Upgrades Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 108: ...5 12 Frame Processor CPU Board Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 122: ...6 14 Working with Installed Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 142: ...8 14 Power Supplies Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 172: ...9 30 Calibration and Diagnostics Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 186: ...10 14 Control Panel Boards Synergy 1 and Synergy 100 Maintenance Guide v16...
Page 230: ...13 20 Miscellaneous Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 240: ...IX 10 Index Synergy 1 and Synergy 100 Maintenance Guide v16 S1...