7-5
7
Explain following items in reference to the User's Manual.
Switching the power on and off
Basic Operation
!! IMPORTANT !!
Leave the main power on at all times. Maintenance operation is automatically carried out every 24 hours
while the machine is not in use. Use the sub power switch for the daily powering on and off.
Main power switch
Sub power switch
Keep the Loading Lever turned up while not
using the machine.
Install Roland VersaWorks in reference to the Quick Start Guide.
Installing Roland Versaworks
System requirements for installing the software
Operating system :
Windows XP Professional Service Pack 1 or later,
or Windows 2000 Service Pack 4 or later
CPU :
Pentium 4 2.0 GHz or faster
Memory (RAM) : 512MB and above (1GB or more recommended)
Monitor : High-resolution SXGA (1,280 x 1,024 pixels) or better display recommended
Free hard-disk space required as a working space : 40 GB or more recommended
Hard-disk file system
:
NTFS format
Make the setting for Roland@NET
Select the check box [Download Updates Automatically and Notify] if the customer accepts it.
Power-saving setting on PC
Turn off the PC's Power-saving functions which make the PC goes stanby or sleep. It may stop a job being
output.