4-53
2
Click!
4-14 BELT TENSION ADJUSTMENT (Referential Time : 20min.)
Connect the Tool Carriage to the Head Carriage and move
them to the right in the lock position.
3
I/S COVER
TOP COVER
FRONT COVER
MAINTENANCE
COVER
LEFT
COVER
Remove the Covers in order.
1. I/S Cover
2. Maintenance Cover
3. Left Cover
4. Front Cover
5. Top Cover
1
[VP-540]
Measure the tension of the belt at the
position above the center of the 4th Grit
Roller from the left using Tension Gauge
(ST-001)(*1).
Pull up the belt until its inside comes to
the top surface of the Cable Guide when
you see it from the machine front(*2). The
tension is proper if the measured value is
0.82kgf to 0.90kgf.
If the tension is improper, move on to the
next step and adjust the belt tension.
BELT
CABLE GUIDE
<*2>
<*1>