
Application Notes
C-13
When Start At Powerup in 2 wire control is configured, the drive will
start if all start permissive conditions are met (within 10 seconds of drive
power being applied), and the terminal block start input (Run, Run
Forward or Run Reverse for 2-wire) is closed. An alarm will be
annunciated from application of power until the drive actually starts,
indicating the powerup start attempt is in progress.
The powerup start attempt will be aborted if any of the following occurs
anytime during the 10-second start interval:
•
A fault condition occurs
•
A Type 2 alarm condition occurs
•
The terminal block programmed enable input is opened
•
All terminal block run, run forward, or run reverse, inputs are
canceled
•
A Stop request (from any source) is received
If the drive has not started within the 10 second interval, the powerup
start attempt will be terminated.
Start At PowerUp
Summary of Contents for 9VT201-007HTNNN
Page 1: ...VTAC 9 AC Drive Firmware Version 3 xx User Manual ...
Page 4: ...soc 2 ...
Page 14: ...P 8 Overview Publication 9VT UM001D EN P Notes ...
Page 56: ...1 42 Installation Wiring Publication 9VT UM001D EN P Notes ...
Page 62: ...2 6 Start Up Publication 9VT UM001D EN P Notes ...
Page 130: ...3 68 Programming and Parameters Publication 9VT UM001D EN P Notes ...
Page 150: ...4 20 Troubleshooting Publication 9VT UM001D EN P Notes ...
Page 176: ...A 26 Supplemental Drive Information Publication 9VT UM001D EN P Notes ...
Page 196: ...B 20 Using the LCD OIM Publication 9VT UM001D EN P Notes ...
Page 212: ...C 16 Application Notes Publication 9VT UM001D EN P Notes ...
Page 223: ......