T
echnical
B
ulletin
PAGE: 5/17
Model: Shepherd-Lt
Date:
14-Jun-19
No.:
RM0D4005
2. Installation>Main Machine Installation>Installation Procedure> Resetting the
Negative Pressure Value to Zero
Descriptions were corrected in
red
and
deleted in strikethrough.
2.
Disconnect the harnesses
tubes
[A] from rear of the negative pressure operation panels [B].