Does the DSB output the motor drive phases?
Y
N
Replace the DSB, UIB, SPU, or SCU.
Replace the motor.
Does the UIB receive a signal from the master belt home position sensor?
Y
N
Does the sensor r 5V?
Y
N
Trace the + 5V supply line through the machine
from the PSU to the sensor and replace the defective PCB.
Replace the sensor.
Replace the UIB, SCU, or SPU.
Main Motor Lock Fail
Main Motor (Motor operation can be checked with service function 09,
mode 6).
Does the SPU r 24VD from the PSU?
Y
N
Does 1POWON go high after Copy is pressed?
Y
N
Replace the SPU or SCU.
Replace the PSU, upper unit interlock switch, or right cover
interlock switch.
Does the SPU 24V at CN5-1, 2, and 3?
Y
N
Replace the SPU.
Does the DRU 24V at CN2-3?
Y
N
Replace the DRU.
Replace the main motor or the SPU or SCU.
5-45
Summary of Contents for FAX7000L
Page 2: ......
Page 8: ...SECTION 1...
Page 24: ...1 3 2 Minimum Space Requirements 1 15...
Page 28: ...1 18a...
Page 50: ...SECTION 2 PROGRAMMING TESTING...
Page 53: ...2 1 Operation Panel 2 1...
Page 169: ......
Page 223: ...S E C T I O N 4...
Page 234: ...S E C T I O N 5...
Page 307: ...S E C T I O N 6...
Page 308: ...SECTION 6 OPTIONAL BAR CODE READER 6 1 Accessory Check List 6 1 6 2 Installation Procedure 6 2...
Page 311: ...S E C T I O N 7...
Page 313: ...7 1 Point to point Diagram 7 1...
Page 314: ...7 2...
Page 315: ...7 3...
Page 344: ...7 3 Block Diagrams 1 Overall Machine Control Overall 7 32...
Page 345: ...Main CPU 7 33...
Page 346: ...Main Slave CPU Interface 7 34...
Page 347: ...Slave CPU...
Page 348: ...Communication Control 7 36...
Page 349: ...2 Video Data Path Transmission 7 37...
Page 350: ...Reception 7 38...
Page 351: ......
Page 352: ...3 Power Distribution From PSU to SPU 7 40...
Page 353: ...Distribution by SPU 7 41...
Page 354: ...UIB and LIB 7 42...
Page 355: ...4 Scanner Fluorescent Lamps 24VD Power Supply 7 43...
Page 356: ...Document Feed Mechanism 7 44...
Page 357: ...CCD Drive 7 45...
Page 358: ...5 Communication Control 7 46...
Page 359: ...6 Printer Laser Diode Drive 7 47...
Page 360: ...Main Scan Synchronization 7 48...
Page 361: ...Fusing Lamp Power Switching 7 49...
Page 362: ...Fusing Lamp Temperature Monitoring...
Page 363: ...7 4 Electrical Component Layout 7 51...
Page 364: ...7 52...
Page 367: ...7 5 Timing Charts 1 Scanner 7 55...
Page 368: ...2 Printer 7 56...
Page 369: ...7 57...
Page 370: ......
Page 371: ...APPENDIX Appendix A Glossary A 1...