6-2
6. Start Ventilation
NOTE
•
To ensure optimum performance of the ventilator,
re-do system check each time when accessories or
components like tubes, humidifiers, or filters are
replaced.
•
If the O
2
cell is installed for the first time, or a
newly replaced one, please calibrate the oxygen
concentration first before running system check,
otherwise the O
2
cell test in the system check is
likely to fail.
To enter the [
System Check
] screen:
◆ The System Check screen is accessed automatically
after powering on the system.
◆ On the non-standby screen, select the [
Standby
]
key and enter the Standby status after your
confirmation. Select the [
System Check
] key in the
Standby status to enter the System Check screen.
The system check screen displays the last system check
time and total system check result.
Connect the gas supply and block the flow sensor as
illustrated. Then select [
Continue
] to start System Check
item by item.
The system check is performed by following the on-
screen steps, instructions, and messages. Make sure the
tests pass before you return the ventilator to clinical
use.
The System Check for dual-limb including the below
items:
◆ Blower Test: test the speed of the blower.
◆ Inhalation Branch Test: test the inspiratory flow
sensor, inspiratory pressure sensor and patient
pressure sensor.
◆ O
2
Branch Test: test the O
2
flow sensor and O
2
Proportional Valve.
◆ O
2
cell Test: test the O
2
sensor.
Summary of Contents for iHope RS Series
Page 1: ...iHope Ventilator User Manual RS Series...
Page 10: ......
Page 12: ......
Page 26: ...1 14 1 Safety Information For your note...
Page 28: ......
Page 36: ...2 8 2 General Information For your note...
Page 38: ......
Page 58: ...3 20 3 Installations and Connections For your note...
Page 60: ......
Page 74: ......
Page 88: ...5 14 5 System Settings For your note...
Page 122: ...6 32 6 Start Ventilation For your note...
Page 158: ......
Page 168: ......
Page 186: ......
Page 200: ...10 14 10 Cleaning and Disinfection For your note...
Page 202: ......
Page 203: ...11 1 11 Specifications 11 Specifications 11 1 Physical Characteristic...
Page 230: ...11 28 11 Specifications For your note...
Page 232: ......
Page 233: ...A 1 A Pneumatic Diagram A Pneumatic Diagram Figure A 1 Pneumatic diagram...
Page 240: ...C 2 C Communications Interface For your note...
Page 248: ...E 2 E Compliance For your note...