
2. Before Installation
2
2
Before installing the EPC-7, unpack and inspect it for shipping damage.
DO NOT REMOVE ANY MODULES FROM THEIR ANTI
-
STATIC BAGS
UNLESS YOU ARE IN A STATIC
-
FREE ENVIRONMENT
.
THE EPC
-
7
MODULES
,
LIKE MOST OTHER ELECTRONIC DEVICES
,
ARE
SUSCEPTIBLE TO ESD DAMAGE
.
ESD DAMAGE IS NOT ALWAYS
IMMEDIATELY OBVIOUS
,
IN THAT IT CAN CAUSE A PARTIAL
BREAKDOWN IN SEMICONDUCTOR DEVICES THAT MIGHT NOT
IMMEDIATELY RESULT IN A FAILURE
.
THE EPC
-
7 CONTAINS A HARD DISK
.
PLEASE HANDLE IT WITH
CARE
.
Configuring the EPC-7 Jumpers
Slot 0 and System Controller Configuration
Before installing the EPC-7 in a VXIbus chassis, a decision must be made whether
the EPC-7 is to be the slot 0 controller and the VMEbus system controller. Every
VXIbus system needs a module that performs the VMEbus system controller
functions (generation of the 16 MHz SYSCLK signal, arbitration of the bus, detection
of bus timeout conditions, and initiation of the interrupt-acknowledge daisy chain),
and the VXIbus slot-0 functions (generation of the 10 MHz ECL CLK10 signals and
control of the MODID module identification function).
Typically, the same device is the slot-0 controller and VMEbus system controller.
The EPC-7 is shipped configured as a VXI slot 0 controller. If this is the intended
use of the EPC-7 (which will usually be the case), skip the rest of this section.
The EPC-7 has nine jumper positions appearing through its rear panel between the
P1 and P2 connectors. See Figure 1 below.
Page 5
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com