Chapter 2 Installing the P1000 Library
Site Requirements
14
ATL P1000 Series User’s Guide
Site Requirements
2
When selecting an installation site for the P1000 library, consider the
following requirements:
•
floor space
•
floor clearance
•
overhead clearance
•
floor strength and inclination
•
power and grounding
•
environmental factors
Floor Space
2
Figure 9 shows the floor space requirements of the stand-alone P1000.
Figure 9 Floor Space
Requirements,
Stand-alone Library
17.5 in.
(45 cm)
24 in. (61 cm)
29.5 in. (75 cm)
54 in. (137.2 cm)
Library
Front
Back
Summary of Contents for P1000 Series
Page 1: ...ATL P1000 Series Tape Library User s Guide 6221101 03 Ver 3 Rel 0...
Page 8: ...Contents viii ATL P1000 Series User s Guide...
Page 12: ...Tables xii ATL P1000 Series User s Guide...
Page 16: ...Preface xvi ATL P1000 Series User s Guide...
Page 72: ...Chapter 3 Basic Operations Performing Manual Operations 56 ATL P1000 Series User s Guide...
Page 88: ...Chapter 4 Operator Commands Unloading the Load Port 72 ATL P1000 Series User s Guide...
Page 112: ...Appendix A Specifications 96 ATL P1000 Series User s Guide...