Chapter 2 Installing the P1000 Library
Site Requirements
ATL P1000 Series User’s Guide
15
Figure 10 shows the floor space requirements for the rack-mount
P1000.
Figure 10 Floor Space
Requirements,
Rack-mount Library
Floor Clearance
2
The stand-alone P1000 has a floor clearance of 0.75 in. (1.9 cm). Place
the library on a level, uncarpeted floor free of defects.
Floor Strength and
Inclination
2
The floor at the installation site must be rated at 250 lb/ft
2
(1221 kg/m
2
). This is sufficient to support a fully loaded P1000 on the
floor or in a rack.
The floor at the installation site must be level to within 0.25 in (6.4 mm)
over a 6 ft by 6 ft (1.8 m by 1.8 m) area.
Overhead Clearance
2
To remove the P1000 enclosure, there must be a minimum clearance of
24 in. (61 cm) above the library. When combined with the height of the
library (21 in./53 cm), this is a total of 45 in. (114.5 cm) from the floor
(stand-alone library) or bottom of the slide (rack-mount library).
Power and Grounding
2
The library auto-ranging power supply accepts single-phase, 90 VAC
to 264 VAC input power at 47 Hz to 63 Hz.
30 in. (76.2 cm)
17.5 in.
(45 cm)
24 in. (61 cm)
19-inch rack
Library
(extended
from rack)
24 in.
(61 cm)
each side
24 in.
(61 cm)
Back
Front
Summary of Contents for P1000 Series
Page 1: ...ATL P1000 Series Tape Library User s Guide 6221101 03 Ver 3 Rel 0...
Page 8: ...Contents viii ATL P1000 Series User s Guide...
Page 12: ...Tables xii ATL P1000 Series User s Guide...
Page 16: ...Preface xvi ATL P1000 Series User s Guide...
Page 72: ...Chapter 3 Basic Operations Performing Manual Operations 56 ATL P1000 Series User s Guide...
Page 88: ...Chapter 4 Operator Commands Unloading the Load Port 72 ATL P1000 Series User s Guide...
Page 112: ...Appendix A Specifications 96 ATL P1000 Series User s Guide...