Appendix B Installing the Slide Assembly in the Rack
Verifying the Rack Requirements
98
ATL P1000 Series User’s Guide
Verifying the Rack Requirements
B
Before installing the slide assembly in the rack, verify that the rack
meets the following requirements.
Rack Current Rating
Consideration
B
Consider the current rating of the rack before installing more than one
P1000 library. The P1000 library is rated 6A/3A (120V/230V). This
means that no more than two libraries can be installed in a typical
15A/120V rack.
If other equipment is installed in the rack, determine the total current
rating of all the equipment before adding the P1000 library to the rack.
Grounding
B
The P1000 must be connected to a grounded power outlet. If the
library is rack-mounted, the rack must also be grounded.
Temperature
B
The rack temperature should be less than 32
°
C.
Summary of Contents for P1000 Series
Page 1: ...ATL P1000 Series Tape Library User s Guide 6221101 03 Ver 3 Rel 0...
Page 8: ...Contents viii ATL P1000 Series User s Guide...
Page 12: ...Tables xii ATL P1000 Series User s Guide...
Page 16: ...Preface xvi ATL P1000 Series User s Guide...
Page 72: ...Chapter 3 Basic Operations Performing Manual Operations 56 ATL P1000 Series User s Guide...
Page 88: ...Chapter 4 Operator Commands Unloading the Load Port 72 ATL P1000 Series User s Guide...
Page 112: ...Appendix A Specifications 96 ATL P1000 Series User s Guide...