Pr
o
Minent
®
Page 44
Cleaning the Membrane
IMPORTANT
• Before removing the sensor, switch off downstream control devices or switch to manual
operation. In case of sensor failure, an incorrect measuring value may be present at the
input of the control/meas ur ing unit and result in an uncontrolled metering in a control
circuit.
• Depressurise the system before removing the sensor! For this purpose, close the
shut-off valves upstream and downstream of the fi tting. When removing the sensor,
liquid might leak if the system is pressurised.
• Read the safety notes of the system operator before opening the DGM/DLG III!
If the membrane is contaminated and the sensor cannot be calibrated, try to gently clean the
membrane.
First remove the sensor.
Remove loosely adhering deposits
Rinse the membrane under a gentle fl ow of cold water, remove lime deposits
For this purpose, immerse the membrane cap into a 1 % hydrochloric acid (e.g. over night).
Rinse the membrane cap with a lot of water.
Now,
fi ll the sensor with electrolyte, let the sensor run in and calibrate again.
Replacing the Membrane
If a calibration is not possible even after cleaning or if the membrane is damaged, it has to be
replaced (see “Assembly”).
Ozone
BA_DR_002_02_09_GB_Cooling.indd 44
BA_DR_002_02_09_GB_Cooling.indd 44
24.02.2009 11:56:05 Uhr
24.02.2009 11:56:05 Uhr