Mounting/Installation
5.3.1
Measuring
Panel
Install a mains cable at the terminal box or at the controller in case of only one controller.
Electrically install the fl ow meter (cables are pre-installed at the controller).
5.3.2
Sample Water Pump
With terminal box: Connect the sample water pump to the terminal box in accordance with the
terminal diagram.
Without terminal box: Connect the sample water pump to the supply voltage as described in
its operating instructions.
5.4
Mounting of the Sensors
Depending on the Identcode (Identcode feature “Sensor assembly”), some sensors will be
delivered already installed in the fi tting. If no sensors are installed, the holes in the fi tting are
tightly sealed.
The following sensors are not delivered as installed because of their sensitivity but enclosed in
the original packaging of the DULCOTROL
®
measuring/control station.
• All pH/ORP sensors
• All amperometric sensors
The sensors for conductivity and temperature are pre-installed.
Before installing the sensors, the respective blanking plugs are to be removed from the
DULCOTROL
®
measuring/control station and the respective sensors are then to be installed. The
installation of the sensors is described in the respective chapter for the measured variable.
5.5
Hydraulic Test Run after Installation
Having completed the installation, a hydraulic test run of the DULCOTROL
®
measuring/control
station is to be performed.
• The sampling valve must be closed! Otherwise, sample water may leak!
• Check all screw fi ttings before the fi rst commissioning!
• Open the shut-off ball valve on the inlet and outlet side.
• The station must be hydraulically leak-proof. No liquids may escape.
Should liquid escape, the cause is to be identifi ed and remedied.