STEP 7: LEVELING THE PLAY SET AND INSTALLING LAG SCREWS
1: LEVEL YOUR PLAY SET FRAME. LEVEL SIDE TO SIDE AND FRONT TO BACK. CHECK THE
DIAGONALS FOR SQUARE. ONCE YOU HAVE A LEVEL AND SQUARE PLAY SET FRAME YOU MAY
INSTALL LAG SCREWS.
2: INSTALL ONE 5/16" X 3-1/2" LAG SCREW WITH 5/16" WASHER INTO THE EMPTY HOLES IN ALL OF
THE SAND BOX BOARDS AND THE FRONT ARCH BOARD.
5/16" X 3-1/2" LAG SCREW
5/16" WASHER
45
Summary of Contents for Redbrook Deluxe 381
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 43: ...PICTURE DESCRIPTION QTY 10 WIKI WAVE SLIDE 03 0013 1 EXTREME TUBE SLIDE 03 0014 1 33...
Page 130: ...APPENDIX 120...
Page 134: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2...
Page 141: ......