L
1: LINE UP THE HOLES OF THE IRON DUCTILE SWING HANGERS WITH THE HOLES IN THE SWING BEAM. IF YOUR BEAM
IS BOWED SLIGHTLY PLACE THE BOW SIDE UP; THE SWING HANGERS WILL BE ON THE BOTTOM.
2: FASTEN EACH SWING HANGER TO THE SWING BEAM USING 7" CARRIAGE BOLTS WITH TORQUE WASHERS, AND
3/8" WASHERS WITH 3/8" LOCK NUTS.
3: PLACE BOLT CAPS OVER EXPOSED THREADS.
STEP 2
8
: IRON DUCTILE SWING HANGERS
7" CARRIAGE BOLT
3/8" LOCK NUT
TORQUE WASHER
3/8" WASHER
BOLT CAPS
IRON DUCTILE
SWING HANGER
66
Summary of Contents for Redbrook Deluxe 381
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 43: ...PICTURE DESCRIPTION QTY 10 WIKI WAVE SLIDE 03 0013 1 EXTREME TUBE SLIDE 03 0014 1 33...
Page 130: ...APPENDIX 120...
Page 134: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2...
Page 141: ......