
Preparation
9 - 1
75-003
Fig. 9 - 01
1
2
9
Preparation
All regulations and instructions in this Instruction Manual are to be observed!
Special attention is to be paid to the safety regulations!
All preparation work is only to be carried out by appropriately trained personnel.
Before all preparation work, the machine is to be separated from the electricity
supply by removing the plug from the mains or switching off the On/Off
switch!
9
.01
Inserting the needle
Only use system
134 KK
needles!
●
Switch on the machine, see
Chapter 8.03 Switching the machine on/off
.
●
Select
SEWING
mode.
●
Select
Threading aid
function (number key 5).
The pressure bar moves out of the needle area, the sewing foot is lowered and the
sewing start is locked.
●
Loosen screw
1
and remove needle
2
.
●
Insert the new needle so that the long needle groove is facing forwards.
●
Tighten screw
1
.
●
Press the
Plus key
.
The machine is ready for operation again.
Summary of Contents for 3586-2/02
Page 4: ......
Page 10: ...1 5 Safety...
Page 22: ...Control elements 7 5...
Page 34: ...Preparation 9 7...
Page 88: ...11 48 Input...
Page 90: ......
Page 126: ...13 30 Adjustment...
Page 149: ...15 3 91 191 431 95 Version 21 05 02 Mains supply 230 V...
Page 150: ...15 4 Axle drives Version 21 05 02 91 191 431 95...
Page 151: ...15 5 91 191 431 95 Version 21 05 02 Sewing drive...
Page 152: ...15 6 Circuit diagram outputs Version 21 05 02 91 191 431 95...
Page 153: ...15 7 91 191 431 95 Version 21 05 02 Circuit diagram inputs...
Page 154: ...15 8 Circuit diagram A20 A26 A30 A50 Version 21 05 02 91 191 431 95...
Page 155: ...15 9 91 191 431 95 Version 21 05 02 Circuit diagram A21 A23...