Wall Mounting Construction
18
Installation Manual
Wall Mounting Construction
Checking the Wall
Which method should be used to mount the up/down wall mount kit depends greatly on the structure of the wall. The
system to be mounted on the wall is heavy (up to 84 k
g
[185.19 lbs] including the elite Panaboard and projector). Before
proceeding with installation, therefore, consult with the building manager, maintenance engineer or designer to verify
that the wall has a structure strong enough to support the weight of the system. For safety, install the elite Panaboard
only after thoroughly understanding the type of walls, the appropriate types of screws and the construction method.
I.
Necessary Tools and Parts (not included with the up/down wall mount kit)
Tools Required for Assembly
Tools and Parts Required for Wall-Mounting Work
Other Parts
*Please choose local certified 4-Way Plug Adaptor.
Notice
•
If necessary, have an extension cord ready. A total cable length (including extension cord) of approximately
5 m (16 ft. 4
27
/
32
in.) is required.
II.
Checkpoints to be Observed While Working
1
Work-Related Safety Precautions
•
Before mounting the up/down unit, read through the following points, and take care to avoid accidents.
— Be absolutely sure to wear a hardhat, protective shoes, safety belt and other safety gear.
— To ensure safety, be absolutely sure to do the work with another individual (= 2-person crew).
— Before proceeding with the work, check that there are no other individuals around you.
— To ensure that the work is accomplished safely and properly, make it a basic rule to strictly observe
all other applicable aspects of safety control.
— If there is a chance that the unit has ended up being deformed or damaged by unexpected impact
while it was being transported and installed, do not install it without taking appropriate measures.
Otherwise, it may fall off the wall.
10 mm (
13
/
32
in.) Wrench - - - 3
(Ideally, one of these should
be a ratchet type of wrench.)
13 mm (
1
/
2
in.)
Wrench - - - - - - - - - 1
4 mm (
5
/
32
in.)
Allen Key - - - - - - - 1
Phillips Head
Screwdriver - - - - - 1
Anchor- - - - - - - - - - - - - - - -4
M8 Bolt - - - - - - - - - - - - - - -4
Flat Washer - - - - - - - - - - - -4
Spring Washer - - - - - - - - - - -4
The specified pull-out strength is required per anchor.
M8 anchor bolts are used when installing the up/down unit on the wall.
(Specified pull-out strength: 5,197.5 N [530 k
g
f])
Drill
Select the drill diameter specified for the anchors used.
Measuring Tape / Level
These are used to ensure that the holes drilled in the wall will be positioned precisely.
Dust Pump
This is used for cleaning purposes to ensure that no scraps or chips are left inside
the holes. Note that the cleaning of the insides of the holes must be thorough
because the drive bolts will be subject to a reactive force at the bottom of the holes.
Torque Driver
Use a torque driver whose torque can be specified.
(Recommended tightening torque: 12.5 N•m [127 k
g
f•cm])
5 m (16 ft. 4
27
/
32
in.) Video Cable (D-sub Cable)
5 m (16 ft. 4
27
/
32
in.) Power Cable
3 m (9 ft. 10
1
/
8
in.)
4-Way Plug Adaptor *
(with 3-Conductor
Ground, Magnet)
UE-608030_EN.book 18 ページ 2010年10月28日 木曜日 午後4時20分