3.
Repeat steps 1 and 2 for other CSs, and relocate the CSs when necessary.
a.
Plan adjacent CS coverage areas so that areas meet where radio signal strength level is "7" to "9".
Channel no. 0
Channel no. 1
b.
Plan the CS coverage areas to meet for at least 2 CSs at any location in the installation site.
Channel no. 0
Channel no. 1
Channel no. 2
Channel no. 3
c.
Make sure that the radio signal strength level is greater than "3" at any location in the service area
required by the user.
Note
•
If a channel is set, the results of measurement for the 24 slots on the channel are saved each time.
If the same channel is set, the new results override the previous ones. Therefore, a measurement
of 5 channels
´
24 slots in total can be made.
•
If correct results cannot be obtained (e.g., there are many frame errors), change the location of the
CS and repeat the site survey to select the best location.
236
Installation Manual
3.11.5 Site Survey
Summary of Contents for KX-TDE100
Page 40: ...40 Installation Manual 1 4 3 System Capacity ...
Page 48: ...48 Installation Manual 2 1 3 Activation Key File ...
Page 262: ...262 Installation Manual 3 16 1 Starting the PBX ...
Page 270: ...270 Installation Manual 4 3 1 Installing and Starting the Maintenance Console ...
Page 283: ...Section 6 Appendix Installation Manual 283 ...
Page 286: ...286 Installation Manual 6 1 2 PMMPR Software File Version 2 01xx ...
Page 287: ...Index Installation Manual 287 ...
Page 293: ...Installation Manual 293 Notes ...