Installing the Central Office Terminal Equipment
39
Mount the COT Shelf
The PG-Flex COT shelf mounts in a standard 23-inch CO equipment bay. The shelf has a mounting
height requirement of 8.75 inches.
1
Align the shelf (Figure 17) universal mounting brackets with the four vertical mounting holes.
2
Install the mounting screws.
Figure 17. Mounting the FCS-719 COT Shelf
Summary of Contents for PG-Flex
Page 10: ...PG Flex System Overview 2 Figure 1 Typical PG Flex Configuration 23 Shelf shown ...
Page 24: ...PG Flex System Overview 16 ...
Page 52: ...Installing PG Flex System Hardware 44 Figure 21 Connecting the Metallic Bypass Pair ...
Page 62: ...Installing PG Flex System Hardware 54 ...
Page 66: ...Terminal Management 58 Figure 28 Connecting an ASCII Terminal to a Line Unit ...
Page 104: ...Performance Monitoring 96 ...
Page 120: ...Troubleshooting 112 ...
Page 158: ...Screen Menus and Definitions A 36 ...
Page 162: ...Acronyms and Glossary Glossary 4 ...
Page 167: ......
Page 168: ......