IW SPM IP Fault Management
Nortel Networks Confidential
42
Copyright © 2004, Nortel Networks
7
Determine the state of the module from the SELECT display.
8
Perform an in-service test on the module by typing
>TST
and pressing the Enter key.
Example of a MAP screen:
9
Determine the test condition of the module.
10
Return the module to service by typing
>RTS
and pressing the Enter key.
If the module is
Do
SysB
in any other state
If the test results show
Do
Test passed.
Test failed.
ListAlm
ListAlm: SPM 11 OC3
SEVERITY ALARM ACTION
––––––––––––––––––––––––––––––
Critical None
Major PROTFAIL RPT
Minor None
No_Alarm None
SPM 11 OC3 1 Act ISTb
Loc : Row E FrPos 8 ShPos 24 ShId 0 Slot 10 Prot Grp : 1
Default Load: SPMLOAD Prot Role: Spare
Clock:Input Ref: Internal Source: C Side 0 Current Mode:
Acquire
Tst
SPM 3 CEM 0 Test : Request has been submitted.
SPM 3 CEM 0 Test : Test passed.