IW SPM IP Fault Management
Nortel Networks Confidential
38
Copyright © 2004, Nortel Networks
12
Determine whether the NOSPARE alarm has cleared.
13
Determine the state of the module.
14
Perform an in-service test on the module by typing
>TST
and pressing the Enter key.
Example of a MAP screen:
15
Determine the test condition of the module. I
If the alarm list indicates
Do
NOSPARE
Step
None
Step
If the module is
Do
SysB
Step
in any other state
Step
If the test results show
Do
Test passed.
Step
Test failed.
Step
ListAlm
ListAlm: VSP_GRP 1
SEVERITY ALARM ACTION
––––––––––––––––––––––––––––––
Critical None
Major None
Minor None
No_Alarm None
SPM 3 OC3 1 Act ISTb
Loc : Row E FrPos 8 ShPos 24 ShId 0 Slot 10 Prot Grp : 1
Default Load: SPMLOAD Prot Role: Spare
Clock:Input Ref: Internal Source: C Side 0 Current Mode:
Acquire
Tst
SPM 3 CEM 0 Test : Request has been submitted.
SPM 3 CEM 0 Test : Test passed.