SECTION 3 -- FIELD OPERATION
3--140
The weights are clamped together by means of the
long through bolts (1) and (3) and secured to the
carrier by the clamp bolts (2).
The weights may be removed as a complete set with
the aid of suitable lifting gear. Loosen the clamp bolts
(2) and slide the clamp assembly sideways out of the
weight pack. With a lifting bar passed through the
central hole, the complete weight set may now be
lifted off the carrier.
Alternatively, the weights can be removed
individually after loosening the clamp bolts and
removing all four through bolts (1) and (3).
236
WARNING
The tractor must not be operated unless all four
through bolts and the clamp bolts are in position with
the bolts tightened to 169 Nm (125 lbf.ft.). Recheck
the bolt torques after 50 hours of operation.
A towing facility is built into the weight carrier.
However, if the weights are installed a tow pin (1), is
available that clamps onto the front of the weight
pack.
237
If the front weights and weight carrier are not
installed, a tow pin is available for bolting directly to
the front axle support.
238
Summary of Contents for T6010 DELTA
Page 1: ...OPERATOR S MANUAL T6010 T6020 T6030 T6050 T6070 Delta and Plus Tractors ...
Page 6: ...BLANK ...
Page 28: ...SECTION 1 GENERAL INFORMATION AND SAFETY 1 22 NOTES ...
Page 280: ...SECTION 3 FIELD OPERATION 3 146 NOTES ...
Page 366: ...SECTION 5 FAULT FINDING 5 12 NOTES ...
Page 368: ...SECTION 6 VEHICLE STORAGE 6 2 NOTES ...
Page 400: ...SECTION 8 SPECIFICATIONS 8 24 NOTES ...
Page 402: ...SECTION 9 1ST 50 HOUR SERVICE SHEETS 9 2 ...
Page 404: ...SECTION 9 1ST 50 HOUR SERVICE SHEETS 9 4 ...
Page 410: ...SECTION 10 INDEX 10 6 ...
Page 412: ...sblank ...