Chapter 9
Upgrading Your Server
This chapter describes internal optional devices available for the server, procedures for install or
removing such optional devices, and notes on using them.
IMPORTANT:
You may conduct the installation and removal procedures described
in this section by yourself. However, NEC is not responsible for any
machine or component defects or bad influences resulting from the
operation of the server subject to the installation or removal. NEC
recommends that you request a maintenance engineer of your
service representative having the expert knowledge on the server to
do the installation and removal procedures.
Use the options and cables approved by NEC. You will be charged
by any repair of a malfunction, fault, or defect occurring in a server
in which one or more component not approved by NEC are used.
Always update the system if the hardware configuration is changed
(See Chapter 5 for details).
Summary of Contents for Express5800 120Li
Page 16: ...x This page is intentionally left blank ...
Page 54: ...2 26 General Description This page is intentionally left blank ...
Page 180: ...7 12 Maintenance This page is intentionally left blank ...
Page 214: ...8 34 Troubleshooting This page is intentionally left blank ...
Page 277: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Page 286: ...10 10 Internal Cabling Diagrams This page is intentionally left blank ...
Page 344: ...F 4 Product Configuration Record Table This page is intentionally left blank ...