Upgrading Your Server 9-5
PREPARING FOR INSTALLATION AND REMOVAL
Prepare the installation or removal of a component depending on the following procedure:
1.
Shut down the OS.
2.
Press the POWER switch to turn off the power of the server. (The POWER/SLEEP lamp
goes off.)
3.
Pull out all the power cords from the AC inlet on the server.
4.
Remove all the cables connected to the server on the rear panel.
5.
Make the clearance of 1 m to 2 m in the front and rear sides and left and right sides of the
server.
Summary of Contents for Express5800 120Li
Page 16: ...x This page is intentionally left blank ...
Page 54: ...2 26 General Description This page is intentionally left blank ...
Page 180: ...7 12 Maintenance This page is intentionally left blank ...
Page 214: ...8 34 Troubleshooting This page is intentionally left blank ...
Page 277: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Page 286: ...10 10 Internal Cabling Diagrams This page is intentionally left blank ...
Page 344: ...F 4 Product Configuration Record Table This page is intentionally left blank ...