9-32 Upgrading Your Server
Installation
1.
See the section "Preparing for Installation and Removal" described earlier to prepare.
2.
Remove the side cover.
3.
Remove the two screws fixing the dummy cover.
4.
Pull out the dummy cover toward you carefully.
5.
Fix the rails coming with the server to the 5.25-inch device by using the four screws
coming with the device.
IMPORTANT:
Always use the screws coming with the 5.25-inch device. Using
longer screws or those of different diameter may cause the device to
be broken.
When installing a double-height device, use the DLT device rails
(larger L-shaped rail) that come with the server.
Summary of Contents for Express5800 120Li
Page 16: ...x This page is intentionally left blank ...
Page 54: ...2 26 General Description This page is intentionally left blank ...
Page 180: ...7 12 Maintenance This page is intentionally left blank ...
Page 214: ...8 34 Troubleshooting This page is intentionally left blank ...
Page 277: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Page 286: ...10 10 Internal Cabling Diagrams This page is intentionally left blank ...
Page 344: ...F 4 Product Configuration Record Table This page is intentionally left blank ...