8.3.
Preparation before first start-up
Before first start-up
the unit must be in a perfect technical condition, properly installed and wired
the unit must be set to the unit-state “Programming Mode” by setting the DIL switch slider 3
“OFF”
the unit must be connected via the USB port to a PC / notebook or alternatively to an
optional BG320 programming- and display unit
the operator surface OS6.0 must be installed correctly and running on the PC
all Parameters must be set to correct values
Commissioning may only be performed by qualified personnel.
The machine / equipment must be protected from unauthorized persons, because
undefined states of the machine / plant can occur during the first start up procedure.
The machine must be securely mounted and ready to operate.
The safety function of the unit cannot be guaranteed before the commissioning is
completed.
Summary of Contents for DS230 Series
Page 10: ...Ds230_03a_oi_e doc Jun 15 Page 10 100 4 3 DS236 Block Diagram 4 4 DS236 Connections...
Page 11: ...Ds230_03a_oi_e doc Jun 15 Page 11 100 4 5 DS240 Block Diagram 4 6 DS240 Connections...
Page 12: ...Ds230_03a_oi_e doc Jun 15 Page 12 100 4 7 DS246 Block Diagram 4 8 DS246 Connections...
Page 100: ...Ds230_03a_oi_e doc Jun 15 Page 100 100 12 Certificate...