3.2 Starting Up the System
3.2 Starting Up the System
Normally, you do not need to switch off power at the end of the day. If the system will
not be used for more than a day, it is best to turn off the instrument. Use the following
procedure only if the system has been switched off.
Note:
Refer to the SOFTmax PRO operator’s manual for software installation and
registration instructions. These instructions assume the software is completely loaded on
your computer and you are ready to begin an experiment.
1 Switch on instrument power.
a
Locate the power switch for the instrument as shown in the figure below.
b
Press the rocker switch to the ON
position (
I
).
FLEXstation
™
100-240V~ 5A 50-60 Hz T6.3 AH
s/n FS 01001
C
NRTL/C
LR88026
"PATENTS PENDING"
US
Parallel Port
(not currently in use)
RS-232 Serial Port
Power Cord Receptacle
RS-232 Serial Cable
Power Cord
Fuse Box Cover
Power Switch
Power Switch Location
The instrument automatically performs diagnostic checks to ensure that it is
functioning correctly. All three drawers open and shut. After about four minutes, the
control panel should display the temperature inside the reading chamber. The reading
chamber drawer automatically opens.
After about five minutes, the instrument will be warmed up and ready.
Note:
There will be no set point temperature displayed at this point because the
incubator has not been turned on.
actual˚C
set pt˚C
Set Temp
Temp
on/off
Drawers
reading
chamber
compounds
tip rack
Control Panel Ready
FlexStation II Operator’s Manual – Rev. D
45
Summary of Contents for FlexStation II
Page 6: ...FlexStation II Operator s Manual Rev D vi ...
Page 92: ...4 Applications 86 FlexStation II Operator s Manual Rev D ...
Page 102: ...5 Service and Maintenance Procedures 96 FlexStation II Operator s Manual Rev D ...
Page 124: ...6 Troubleshooting Procedures 118 FlexStation II Operator s Manual Rev D ...
Page 134: ...7 Appendices 128 FlexStation II Operator s Manual Rev D ...