8
- 25
8.2 Program Example of Multi-network System
8.2.2 Setting and communication contents
8
PROGRAMMING
(d) Routing parameters
1) Considering routing parameters
Consider the routing parameters with the parameter sheet.
(
Appendix 5.7 Routing parameter)
2) Parameter setting
Complete settings in GX Developer based on the contents filled in the
parameter sheet.
Figure 8.39 System configuration
Figure 8.40 Routing parameters
Figure 8.41 Example for filling in routing parameter sheet
Figure 8.42 Routing parameter setting (Control station (1M
P
1))
CC-Link IE controller
network module
Control
station
1M
P
1
Control
station
2M
P
1
Normal
station
1N
S
2
Normal
station
2N
S
2
Network No.1
Network No.2
"To go to network No.2, data passes through station No.2 of its own network No.1."
1
1
2
Target
network No.
Relay
network No.
Relay
station No.
2
No setting is required for relay station (1N
S
2)
because data are transmitted via the station.
1
No.
Target
network No.
Relay
network No.
Relay
station No.
Summary of Contents for QJ71GP21-SX
Page 1: ......
Page 2: ......
Page 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Page 649: ......
Page 650: ......