5Maintenance and Inspection
Maintenance and inspection procedures 4-104
[Caution]
When you remove the cover, don't remove other than the screw shown in
(1) Refer to
, and remove the covers.
(2) The names of the cover and installation screw are given in
correspond
to
.
(3) Depending on the robot's posture, some covers are hard to be removed. In such a case, change the robot's
posture by performing jog operation to remove the covers.
(4) When reattaching the covers after a maintenance inspection, proceed in the reverse order of their removal.
Tightening the screw with the torque shown in
Note) Please wipe off the grease which splashed from the ball screw spline at the time of maintenance inspec
-
tion.
Clean/Waterproof specification
<1>
Base cover B (L)
SUS hexagon socket screw, M4×10
8
With seal washer.
<2>
Base cover B (R)
SUS hexagon socket screw, M4×10
8
With seal washer.
<3>
No.1 Arm cover A
SUS hexagon socket screw, M4×10
8
With seal washer.
<4>
Arm cover A (1)
SUS hexagon socket screw, M4×8
8
With seal washer.
<5>
No.1 Arm cover B
SUS hexagon socket screw, M4×10
8
With seal washer.
<6>
Motor cover J2
SUS hexagon socket screw, M4×10
8
With seal washer.
<7>
Motor cover J3
SUS hexagon socket screw, M4×10
8
With seal washer.
<8>
Arm cover A (2)
SUS hexagon socket screw, M4×8
8
<9>
Arm cover A (3)
SUS hexagon socket screw, M4×8
8
<10>
No.2 Arm cover
SUS hexagon socket screw, M4×10
8
With seal washer.
<11>
Belt pulley cover J4
SUS hexagon socket screw, M4×10
8
With seal washer.
Note1)Bolting torque of each fixing screw is 1.39 to 1.89N ・ m.
No.
Cover name
Installation screw name
Note1)
Qty.
Remarks