VII
Control ]
- 132 -
HWE0803A
GB
[2] Controlling the Outdoor Unit
-1- Outline of Control Method
The outdoor units are designated as OC and OS in the order of capacity from large to small (if two or more units have the
same capacity, in the order of address from small to large).
The setting of outdoor unit can be verified by using the self-diagnosis switch (SW1).
The OC determines the operation mode and the control mode, and it also communicates with the indoor units.
The OS exercises autonomous distributed control (over defrost, error detection, and actuator control etc.) according to the
operation/control mode signals that are sent from the OC.
-2- Startup sequence rotation
At the initial startup, outdoor units start up in the order of "OC and OS."
Startup sequence rotation is performed while all the indoor units are stopped. (Even after two hours of operation, startup se-
quence rotation is not performed while the compressor is in operation.)
In a system with multiple outdoor units (OC and OS), when the integrated operation time of the unit in operation (either OC or
OS) reaches one hour during a cooling operation at low outside temperature, that unit will stop and the other unit will go into
operation.
Refer to [-10-Control at Initial Start-up] for the initial startup.
Performing startup sequence rotation does not change the basic operation of OC and OS. Only startup sequence is changed.
Startup sequence of the outdoor units can be checked with the self-diagnosis switch (SW1) on the OC.
-3- Initial Control
When the power is turned on, the initial processing of the microcomputer is given top priority.
During the initial processing, control processing of the operation signal is suspended. (The control processing is resumed after
the initial processing is completed. Initial processing involves data processing in the microcomputer and initial setting of each
of the LEV opening. This process will take up to 5 minutes.)
During the initial processing, the LED monitor on the outdoor unit's control board displays S/W version -> refrigerant type
-> heat pump -> cooling only and capacity -> and communication address in turn every second.
-4- Control at Start-up
The upper limit of frequency during the first 3 minutes of the operation is 50 Hz.
When the power is turned on, normal operation will start after the initial start-up mode (to be described later) has been com-
pleted (with a restriction on the frequency).
Display
SW1
ON
1 2 3
5
4
6 7 8 9 1 0
The unit is designated as the OC: “oc” appears on the display.
The unit is designated as OS: “oS” appears on the display
Display
SW1
OC→OS: “oc” and the “OC” address appear alternately on the display.
OS→OC: “oS” and the “OS” address appear alternately on the display.
ON
1 2 3
5
4
6 7 8 9 1 0
Summary of Contents for PURY-P120Y(T)HMU-A
Page 1: ......
Page 11: ... 2 ...
Page 25: ... 16 ...
Page 65: ... 56 ...
Page 89: ... 80 ...
Page 91: ... 82 ...
Page 99: ... 90 ...
Page 101: ... 92 ...
Page 115: ... 106 ...
Page 117: ... 108 ...
Page 133: ... 124 ...
Page 161: ... 152 ...
Page 163: ... 154 ...
Page 187: ... 178 ...
Page 341: ... 332 ...
Page 387: ......