
[
VII
Control ]
- 96 -
HWE1113B
GB
[2] Controlling the Outdoor Unit
Initial Control
-1- Initial Control
When the power is turned on, the initial processing of the microcomputer is given top priority.
During the initial processing, control processing of the operation signal is suspended. (The control processing is resumed after
the initial processing is completed. Initial processing involves data processing in the microcomputer and initial setting of each
of the LEV opening. This process will take up to 5 minutes.)
During the initial processing, the LED monitor on the outdoor unit's control board displays S/W version -> refrigerant type
-> heat pump -> cooling only and capacity -> and communication address in turn every second.
Control at Start-up
-2- Control at Start-up
The upper limit of frequency during the first 3 minutes of the operation is 50 Hz.
When the power is turned on, normal operation will start after the initial start-up mode (to be described later) has been com-
pleted (with a restriction on the frequency).
Summary of Contents for City Multi CMB-WP108V-G
Page 1: ...AIR CONDITIONER 2014 Service Handbook PURY WP200 WP250YJM A CMB WP108V G Model 3rd edition ...
Page 11: ... 2 HWE1113B GB ...
Page 27: ... I Read Before Servicing 18 HWE1113B GB ...
Page 29: ... 20 HWE1113B GB ...
Page 57: ... 48 HWE1113B GB ...
Page 70: ... III Outdoor Unit Components 61 HWE1113B GB 2 Power supply circuit board ...
Page 71: ... III Outdoor Unit Components 62 HWE1113B GB ...
Page 73: ... 64 HWE1113B GB ...
Page 81: ... IV Remote Controller 72 HWE1113B GB ...
Page 83: ... 74 HWE1113B GB ...
Page 89: ... 80 HWE1113B GB ...
Page 97: ... 88 HWE1113B GB ...
Page 127: ... 118 HWE1113B GB ...
Page 135: ... VIII Test Run Mode 126 HWE1113B GB ...
Page 137: ... 128 HWE1113B GB ...
Page 253: ... 244 HWE1113B GB ...