C-20 Description of Self Test Items
C.1.43
Z1501
MF FPGA and SM ARM Interconnection Test
Top test item
Communication self test between PC Module and MF FPGA
Test content
Test whether UART communication between MF FPGA and battery management ARM works well.
Send the order through SM serial port drive, and re-read the data via the serial port.
Analysis to test failure
The drive goes wrong if the test result appears
Error
.
UART interconnection between MF FPGA and battery management’s ARM goes wrong if the test
fails.
Suggestion to failure test
Restart the device to perform the self test if the test result appears
Error.
It is necessary to restore
the device (OS+doppler) if
Error
re-appears.
It is recommended to replace the battery management board if the test result is
FAIL
.
C.1.44
Z1502
Battery I2C Interconnection Test
Top test item
Communication test between MF FPGA and battery management ARM
Test content
Read the position of battery via SM serial port, and test whether 12C interface communication
between battery and battery management ARM works well.
Analysis to test failure
The drive goes wrong if the test result appears
Error
.
The interconnection between left battery and battery management ARM goes wrong if the test
result is
FAIL
.
Suggestion to failure test
Restart the device to perform the self test if the test result appears
Error.
It is necessary to restore
the device (OS+doppler) if
Error
re-appears.
It is recommended to replace the battery, and then replace battery management board if the test
result is
FAIL
.
C.1.45
Z1503
Battery Test
Top test item
12C interconnection self test of battery
Test content
Read the voltage, temperature, current, volume and charging times, etc., of the battery via SM
serial port.
Analysis to test failure
The drive goes wrong if the test result appears
Error
.
The interconnection between the battery and battery management ARM goes wrong if the test
result is
FAIL
.
Summary of Contents for DC-68
Page 2: ......
Page 12: ......
Page 18: ......
Page 30: ......
Page 45: ...System Installation 3 15...
Page 54: ......
Page 72: ......
Page 90: ......
Page 108: ...8 2 Field Replaceable Unit 8 1 Explosive View A0 B0 C0 D0 E0 F0 G0...
Page 121: ...Field Replaceable Unit 8 15 8 2 5 Main Unit Assembly E0 E2 E4 E6 E5 E9 E8 E3 E7 E1...
Page 123: ...Field Replaceable Unit 8 17 E13 E22 E10 E17 E16 E14 E18 E19 E23 E20 E21 E15 E11 E12 E24...
Page 134: ......
Page 180: ......
Page 212: ......
Page 254: ......
Page 258: ......
Page 280: ......
Page 281: ...P N 046 011984 00 7 0...