5-36 | Model 920 Multi-Gas Analyzer
9. Replace the Optical Bench/Measuring Cell Assembly in the analyzer:
Ensure there is no power being supplied to the analyzer while install-
ing the Optical Bench.
a. With the blue Support Arm Yoke fully extended, lift the Optical
Bench/Measuring Cell Assembly by its upper portion and carefully
move it toward the analyzer. Align its Optical Bench Support Plate
with the Support Arm Yoke and replace the pivot pin. Tighten the
set screw. The Optical Bench should swing freely.
b. Connect Optical Bench wiring:
Ribbon cable from
J102
on
Micro-Interface
board to
J100
on
Optical
Bench
board.
AC power line (connector plug) to
TB100
on
Optical Bench
board.
Connect the yellow/green
ground
wire using the disconnect
terminals.
c.
Optional:
If using, connect the purge line (black tube) to the
Optical Bench Purge Fitting.
10. Install the Measuring Cell in the Analyzer Oven:
a. Open the Oven door. Swing the Optical Bench toward the
Electronics Enclosure and then swing the Measuring Cell toward
the Oven (Figure 5-6).
Align the hole in the Heat Transfer Block with the Cell RTD tip on
the Heater Plate and carefully push the Measuring Cell toward the
RTD. Adjust the entire Measuring Cell/Optical Bench Assembly as
required to firmly seat the Measuring Cell against the Heater Plate.
!
WARNING
Summary of Contents for 920
Page 39: ...Specifications 2 11 ...
Page 40: ...2 12 Model 920 Multi Gas Analyzer ...
Page 41: ...Specifications 2 13 2019 02 05 ...
Page 42: ...2 14 Model 920 Multi Gas Analyzer ...
Page 43: ...Specifications 2 15 ...
Page 44: ...2 16 Model 920 Multi Gas Analyzer ...
Page 45: ...Specifications 2 17 ...
Page 47: ...Specifications 2 19 Heater Plate ATEX and IECEx Certificates and Marking ...
Page 48: ...2 20 Model 920 Multi Gas Analyzer ...
Page 49: ...Specifications 2 21 ...
Page 50: ...2 22 Model 920 Multi Gas Analyzer ...
Page 51: ...Specifications 2 23 ...
Page 52: ...2 24 Model 920 Multi Gas Analyzer ...
Page 53: ...Specifications 2 25 ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Page 55: ...Specifications 2 27 ...
Page 56: ...2 28 Model 920 Multi Gas Analyzer ...
Page 57: ...Specifications 2 29 ...
Page 58: ...2 30 Model 920 Multi Gas Analyzer ...
Page 59: ...Specifications 2 31 ...
Page 71: ...Installation and Start Up 3 11 Figure 3 4 Optical Bench Measuring Cell assembly ...
Page 108: ...3 48 Model 920 Multi Gas Analyzer This page intentionally left blank ...
Page 173: ...Controller User Interface 4 65 Figure 4 8 Customer signal connections ...
Page 187: ...Maintenance and Troubleshooting 5 11 Figure 5 1 Measuring Cell assembly ...
Page 262: ...A 2 Model 920 Multi Gas Analyzer Ribbon Cable Interconnect WX 102836 ...
Page 263: ...Appendix A Drawings A 3 GP Lower Enclosure to Electronics Wiring CE Analyzers WX 102810 ...
Page 264: ...A 4 Model 920 Multi Gas Analyzer Heater and Sensor Wiring GP Div 2 Analyzers WX 102851 ...
Page 265: ...Appendix A Drawings A 5 Heater and Sensor Wiring CE Zone 1 Analyzers WX 102852 ...
Page 266: ...A 6 Model 920 Multi Gas Analyzer Lower Cabinet Wiring CE GP Analyzers 120V 100 1341 3 ...
Page 267: ...Appendix A Drawings A 7 Lower Cabinet Wiring CE GP Analyzers 240V 100 1342 3 ...
Page 268: ...A 8 Model 920 Multi Gas Analyzer Signal Wiring PD GP Div 2 CE Zone 1 Analyzers WX 102815 ...
Page 271: ...Appendix A Drawings A 11 24V Power Supply DC Wiring CE Zone 1 Analyzers WX 102812 ...
Page 272: ...A 12 Model 920 Multi Gas Analyzer RS 232 Communications Cable Wiring 300 9480 ...
Page 273: ...Appendix A Drawings A 13 RS 232 RS 485 Module Wiring CE Zone 1 GP Div 2 Analyzers 100 2185 ...
Page 274: ...A 14 Model 920 Multi Gas Analyzer Microcontroller Board 100 0117 ...
Page 275: ...Appendix A Drawings A 15 Host Controller Board Display Interface 100 0138 ...
Page 278: ...S 2 Model 920 Multi Gas Analyzer This page intentionally left blank ...