6 - ORDINARY MAINTENANCE
6 - 7
TYRES AND WHEEL COLUMNS
Check the tyre pressure with a a pressure gauge and, if needed, inflate them
through valve "A".
The correct tyre inflation pressure is indicated on the sticker on the inside of the
wheel rim.
Check the correct tightening of the "B" wheel columns. If needed, tighten the
columns to a torque of 28 Kgm (280 Nm).
• SCHEDULED MAINTENANCE AFTER THE FIRST 50 HOURS
NUTS
AND
BOLTS
OF
THE
STEERING COMPONENTS
FRONT BRIDGE (A)
Tighten to torque 30 kgm (220 lbft /
295 Nm) screws "A1" fastening the
jack to the bridge (4 screws).
REAR BRIDGE (P)
Tighten
to
torque screws "P1"
fastening the jack to the bridge (4
screws).
NUTS AND BOLTS FASTENING THE BRIDGES TO THE FRAME
FRONT BRIDGE (A)
Tighten to a torque of 45 Kgm (440 Nm) (325 lbft) the 8 "V2" screws which fasten the front bridge to the frame.
Summary of Contents for P25.6
Page 2: ...04 2017 PUBLICATION DATE...
Page 4: ......
Page 6: ......
Page 21: ...2 MACHINE TECHNICAL SPECIFICATIONS 2 9...
Page 27: ...3 STICKERS WITH CONTROL DESCRIPTIONS LEAFLETS IN THE CABIN 3 3 STICKERS OF CONTROL PANEL P...
Page 28: ...3 STICKERS WITH CONTROL DESCRIPTIONS LEAFLETS IN THE CABIN 3 4 OUTSIDE CAB STICKERS...
Page 30: ......
Page 60: ......
Page 78: ......
Page 90: ...6 ORDINARY MAINTENANCE 6 12...
Page 114: ......
Page 120: ......
Page 138: ...9 HYDRAULIC CIRCUITS DIAGRAMS 9 2 HYDROSTATIC TRANSMISSION CIRCUIT...
Page 140: ...9 HYDRAULIC CIRCUITS DIAGRAMS 9 4 HYDRAULIC SYSTEM...
Page 142: ......
Page 143: ...10 ELECTRICAL SYSTEM 10 1 INDEX GENERAL FEATURES 2 BATTERY 2 FUSES 4 END OF CHAPTER 5...
Page 148: ......
Page 149: ...M2 M2 P256 AU 01 1...
Page 150: ...M2 2 M2 P256 AU 01...
Page 151: ...M2 M2 P256 AU 01 3...
Page 152: ...M2 4 M2 P256 AU 01...
Page 153: ...M2 M2 P256 AU 01 5...
Page 154: ...M2 6 M2 P256 AU 01...
Page 155: ...M2 M2 P256 AU 01 7...
Page 156: ...M2 8 M2 P256 AU 01...
Page 157: ...M2 M2 P256 AU 01 9...
Page 158: ...M2 10 M2 P256 AU 01...
Page 159: ...M2 M2 P256 AU 01 11...
Page 160: ...M2 12 M2 P256 AU 01...
Page 161: ...M2 M2 P256 AU 01 13...
Page 162: ......
Page 163: ...MODULE M3 ATTACHMENTS FOR MERLO ZM2 CARRIAGE...
Page 164: ......
Page 166: ......
Page 172: ......
Page 230: ...MODULE 3 SECTION 2 ATTACHMENTS 62 M M3 3 Z ZM M2 2 0 03 3 E EN N...
Page 231: ...ATTACHMENTS FOR MERLO ZM2 CARRIAGE M3...
Page 232: ......