
ATTACHMENTS
SECTION 2
MODULE 3
M
M
3
3
-
-
Z
Z
M
M
2
2
-
-
0
0
3
3
(
(
E
E
N
N
)
)
45
Loading the bucket manually
WARNING!
RISK OF ACCIDENTS!
DO NOT EXCEED the maximum capacity.
Tilt the bucket upwards to close the front
guard.
Turn the selector switch (MC) to position "2";
continuous propeller rotation is activated
(refer to MODULE 1
SECTION 5
CONTINUOUS DELIVERY OF HYDRAULIC OIL).
Fill with bulk cement through the specific grille
(A) or place a bag of cement on the blade (B)
to open it.
WARNING
MAXIMUM BUCKET CAPACITY.
Maximum capacity is reached with the carriage
in a vertical position, when the material reaches
the edge of the bucket (ref. MAX).
Unloading chute assembly
Work with the boom raised to about 1.5 m (59 in)
from ground level with the engine OFF.
WARNING!
RISK OF INJURIES!
DO NOT TAKE UP A POSITION underneath the
attachment during the following operations.
Extract the chute from the transport position
and release the bracket (1).
Insert the chute guideways (2) near the
material unloading hatch.
Summary of Contents for P25.6
Page 2: ...04 2017 PUBLICATION DATE...
Page 4: ......
Page 6: ......
Page 21: ...2 MACHINE TECHNICAL SPECIFICATIONS 2 9...
Page 27: ...3 STICKERS WITH CONTROL DESCRIPTIONS LEAFLETS IN THE CABIN 3 3 STICKERS OF CONTROL PANEL P...
Page 28: ...3 STICKERS WITH CONTROL DESCRIPTIONS LEAFLETS IN THE CABIN 3 4 OUTSIDE CAB STICKERS...
Page 30: ......
Page 60: ......
Page 78: ......
Page 90: ...6 ORDINARY MAINTENANCE 6 12...
Page 114: ......
Page 120: ......
Page 138: ...9 HYDRAULIC CIRCUITS DIAGRAMS 9 2 HYDROSTATIC TRANSMISSION CIRCUIT...
Page 140: ...9 HYDRAULIC CIRCUITS DIAGRAMS 9 4 HYDRAULIC SYSTEM...
Page 142: ......
Page 143: ...10 ELECTRICAL SYSTEM 10 1 INDEX GENERAL FEATURES 2 BATTERY 2 FUSES 4 END OF CHAPTER 5...
Page 148: ......
Page 149: ...M2 M2 P256 AU 01 1...
Page 150: ...M2 2 M2 P256 AU 01...
Page 151: ...M2 M2 P256 AU 01 3...
Page 152: ...M2 4 M2 P256 AU 01...
Page 153: ...M2 M2 P256 AU 01 5...
Page 154: ...M2 6 M2 P256 AU 01...
Page 155: ...M2 M2 P256 AU 01 7...
Page 156: ...M2 8 M2 P256 AU 01...
Page 157: ...M2 M2 P256 AU 01 9...
Page 158: ...M2 10 M2 P256 AU 01...
Page 159: ...M2 M2 P256 AU 01 11...
Page 160: ...M2 12 M2 P256 AU 01...
Page 161: ...M2 M2 P256 AU 01 13...
Page 162: ......
Page 163: ...MODULE M3 ATTACHMENTS FOR MERLO ZM2 CARRIAGE...
Page 164: ......
Page 166: ......
Page 172: ......
Page 230: ...MODULE 3 SECTION 2 ATTACHMENTS 62 M M3 3 Z ZM M2 2 0 03 3 E EN N...
Page 231: ...ATTACHMENTS FOR MERLO ZM2 CARRIAGE M3...
Page 232: ......