
215634
38
Revision B
A
D
A
D
C
D
C
B
B
ϭϬϯϴϬϮϰ
Figure 2.43: Rear Vertical Channels and Lift Points
4.
Remove one nut and bolt (A) from each vertical channel (B). Discard the nuts and bolts.
5.
Remove two nuts and bolts (C) from a vertical channel (B). Remove and discard the channel. Repeat this step for the
other vertical channel.
6.
If planning to lift the windrower onto the assembly stands using a crane in the procedure
Assembly Stand (MD #B9064), page 39
:
Reinstall lifting plates (D) using two bolts and nuts (C) per plate.
7.
If planning to lift the windrower onto the assembly stands with a forklift in the procedure
onto Assembly Stand (MD #B9064), page 39
:
Discard nuts and bolts (C). Discard lifting plates (D).