
215634
109
Revision B
Chapter 4:
Performing Predelivery Checks
The windrower must be inspected before delivery to ensure proper functioning.
IMPORTANT:
The machine should not require further adjustments after the assembly process is completed. However, to ensure that the
machine is performing properly, conduct the following checks and complete the yellow predelivery checklist at the end of
this book. Make adjustments only if absolutely necessary and in accordance with the instructions in this manual.
4.1
Completing Predelivery Checklist
The predelivery checklist contains all the features of the machine that require inspection.
Perform the final checks and adjustments listed on the following pages and on the
Predelivery Checklist, page 189
(yellow
sheet attached to this instruction) to ensure that the machine is field-ready.
IMPORTANT:
Ensure that the Operator or the Dealer retains the completed Predelivery Checklist.
4.1.1
Recording Serial Numbers
Serial numbers identify the specific windrower and engine.
Record the windrower and engine serial numbers on the
Predelivery Checklist, page 189
, and confirm the serial number
with the manifest or work order.
1019838
A
B
Figure 4.1: Hood
1.
Move latch (A) toward the right cab-forward side of the
windrower.
2.
Grasp louver (B), and lift the hood to open it.