215634
24
Revision B
1026579
A
B
C
Figure 2.12: Coupler Guard
4.
Remove two front bolts (A), and three rear bolts (B), and
remove coupler guard (C).
1026580
A
B
Figure 2.13: Leg Pin Bolts and Caps
5.
Remove leg pin bolts (A) from both sides, and retain
caps (B) (two per side) for reuse.
NOTE:
If you will be moving the windrower shipping assembly with
a crane, retain the leg pin bolts and nuts for reinstallation.
1026581
A
B
Figure 2.14: Front Skid Bolts
6.
Remove two bolts (A) securing front the skids to lifting
plates (B) on each side.