Assembly- and Installation
Instructions
Lohberger Heiztechnik
GmbH
N28/HB N28/GB
Seite 19
Lohberger Heiztechnik GmbH, A-5020 Salzburg-Bergheim, Rechtes Salzachufer 40
Tel. 0662-450444-0, Fax-DW 9
Es gelten unsere aktuellen allgemeinen Geschäftsbedingungen. Irrtum, Druckfehler und technische Änderungen vorbehalten
7
Fitting of the casing elements incl. control unit
7.1
Insert rear panel
Inserting rear panel
Take the rear panel and insert it at the
back of the boiler.
7.2
Fitting left-hand side panel
Hinging the left-hand side panel
Hook the left-hand side panel into the
corresponding slots on the front inside.
Then clip the left-hand side panel to the
rear panel.
7.3
Fitting right-hand side panel
Hinging the right-hand side panel
Hook the right-hand side panel into the
corresponding slots on the front inside.
Then clip the left-hand side panel to the
rear panel.