Install the power interface board
Use this information to install the power interface board.
Ground package before opening”
Before installing the power interface board, touch the static-protective package that contains the new power
interface board to any unpainted surface on the outside of the server. Then, take the new power interface
board out of the package and place it on a static-protective surface.
To install the power interface board, complete the following steps:
Watch the procedure
. A video of the installation process is available:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-Acsjj4tU79GzKnWG316BYn
• Youku:
http://list.youku.com/albumlist/show/id_50483452
Figure 115. Power interface board installation
Step 1. Insert the hole in the power interface board into the corresponding mounting stud on the chassis.
Then, gently move the power interface board downward so that it is engaged with the mounting
stud.
Step 2. Install the screw to secure the power interface board in place.
After installing the power interface board:
1. Reconnect all cables to the power interface board. See “Power interface board” on page 33.
2. Complete the parts replacement. See “Complete the parts replacement” on page 178.
Hot-swap power supply cage replacement
Use this information to remove and install the hot-swap power supply cage.
Note:
This section applies only to server models that have the hot-swap power supply cage installed.
.
Hardware replacement procedures
157
Summary of Contents for ThinkSystem ST550 7X09
Page 1: ...ThinkSystem ST550 Maintenance Manual Machine Types 7X09 and 7X10 ...
Page 8: ...vi ThinkSystem ST550 Maintenance Manual ...
Page 36: ...28 ThinkSystem ST550 Maintenance Manual ...
Page 188: ...180 ThinkSystem ST550 Maintenance Manual ...
Page 206: ...198 ThinkSystem ST550 Maintenance Manual ...
Page 210: ...202 ThinkSystem ST550 Maintenance Manual ...
Page 219: ......
Page 220: ......