2NP
1-2-2
Unpack
Install the optional paper feeder
Release the scanner lock
Load paper
Remove the tapes and spacer
Start
Install the toner container
Attaching the language label
(Excluding 240V AC)
Make test copies
Connect the power cord
Exit maintenance mode
Print out the user setting list
Execution of initial-setting operation
Execution of mentenance item U952
Adjusting the image
Clearing the counter
(maintenance item U927)
Output an own-status report
(maintenance item U000)
Setting the delivery date
(maintenance item U278)
Completion of the machine installation
Switch the cassette heater switch
Install the other optional devices
1-2-2 Unpacking and installation
(1) Installation procedure
Summary of Contents for TASKalfa 2551ci
Page 1: ...SERVICE MANUAL Published in September 2016 842NP11A 2NPSM06A Rev A TASKalfa 2551ci ...
Page 10: ...This page is intentionally left blank ...
Page 97: ...2NP 1 1 2 74 This page is intentionally left blank ...
Page 259: ...2NP 1 3 162 U486 Details on the modes Figure 1 3 47 Item No Description ...
Page 473: ...2NP 1 5 62 This page is intentionally left blank ...
Page 497: ...2NP 2 1 22 This page is intentionally left blank ...
Page 555: ...2NP 2 3 48 This page is intentionally left blank ...
Page 584: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 620: ...DP 773 Document processor Installation Guide ...
Page 646: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 654: ...PF 810 3000 sheets deck Installation Guide ...
Page 667: ...DF 770 D Document finisher Installation Guide ...
Page 685: ...AK 740 Bridge unit Installation Guide ...
Page 687: ...PH 7A C D Punch unit Installation Guide ...
Page 708: ...DT 730 B Document tray Installation Guide ...
Page 710: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 711: ...FAX System W B Installation Guide ...