2NP-4
1-3-206
U952
Method: [Execute(USB)]
1. Press the power key on the operation panel, and after verifying the main power indicator has
gone off, switch off the main power switch.
2. Insert USB memory in USB memory slot.
3. Turn the main power switch on.
4. Enter maintenance item U952.
5. Select [Execute(USB)].
6. Select the workflow.
7. Press the start key.
Executes maintenance modes defined in a workflow in succession.
Method: [Entry(USB)]
1. Press the power key on the operation panel, and after verifying the main power indicator has
gone off, switch off the main power switch.
2. Insert USB memory in USB memory slot.
3. Turn the main power switch on.
4. Enter maintenance item U952.
5. Select [Entry(USB)].
6. Select the workflow.
7. Select the work flow save area.
8. Select [Execute].
Exports a workflow housed in a USB flash device to the machine.
Example
Registration is feasible when a USB flash device that stores the commands and text/mainte-
nance ID (editable) is inserted.
File Format: xxx.mwf
1.SET UP, 464, 469, 410, 000, 927, 278
2.WARRANTY, 089, 000
3.MK-A, 127, 901, 410, 251
4.MK-B, 410, 251
5.EH SET UP, 411, 034, 246
Completion
Press the stop key. The screen for selecting a maintenance item No. is displayed.
Item No.
Description
Display
Description
WorkFlowData01 - 07
Workflow data in the USB flash device
Display
Description
WorkFlowData01 - 07
Workflow data in the USB flash device
Display
Description
Data1 - 8
The area to store workflows in the machine
USB
USB memory
Summary of Contents for TASKalfa 2551ci
Page 1: ...SERVICE MANUAL Published in September 2016 842NP11A 2NPSM06A Rev A TASKalfa 2551ci ...
Page 10: ...This page is intentionally left blank ...
Page 97: ...2NP 1 1 2 74 This page is intentionally left blank ...
Page 259: ...2NP 1 3 162 U486 Details on the modes Figure 1 3 47 Item No Description ...
Page 473: ...2NP 1 5 62 This page is intentionally left blank ...
Page 497: ...2NP 2 1 22 This page is intentionally left blank ...
Page 555: ...2NP 2 3 48 This page is intentionally left blank ...
Page 584: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 620: ...DP 773 Document processor Installation Guide ...
Page 646: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 654: ...PF 810 3000 sheets deck Installation Guide ...
Page 667: ...DF 770 D Document finisher Installation Guide ...
Page 685: ...AK 740 Bridge unit Installation Guide ...
Page 687: ...PH 7A C D Punch unit Installation Guide ...
Page 708: ...DT 730 B Document tray Installation Guide ...
Page 710: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 711: ...FAX System W B Installation Guide ...