2NP
1-3-91
U202
Setting the KMAS host monitoring system
Description
Initializes or operates the KMAS host monitoring system.
This is an optional device which is currently supported only by Japanese specification machines,
so no setting is necessary.
Purpose
Performed at installation, periodic maintenance, and/or repair.
Method
1. Press the start key.
2. Select the item.
Method: [Init/Set TEL No.]
1. Select the item to be input.
2. Input the telephone number using the numeric keys.
3. Press the start key. The setting is set.
4. Select [Initialize].
5. Select [Execute].
6. Press the start key. Communication with the host initiated.
7. The result of communication will be displayed. (Refer to the result.)
Method: [Call Service End]
1. Select [Execute].
2. Press the start key. Communication with the host initiated.
3. The result of communication will be displayed. (Refer to the result.)
Result table
Completion
Press the stop key. The screen for selecting a maintenance item No. is displayed.
Item No.
Description
Display
Description
Init/Set TEL No.
Initialization/Phone Nbr. se
Call Service End
Outgoing at the end of service activities
Display
Description
TEL No. 1
Sales companies
TEL No. 2
Call center
Display
Description
OK
Communication properly terminated.
NG
Communication error (Nbr. of calls exceeded)
Communication error (Communication timeout)
Communication error (Communication trial timeout)
Communication error (Other)
KMAS unreachable
Summary of Contents for TASKalfa 2551ci
Page 1: ...SERVICE MANUAL Published in September 2016 842NP11A 2NPSM06A Rev A TASKalfa 2551ci ...
Page 10: ...This page is intentionally left blank ...
Page 97: ...2NP 1 1 2 74 This page is intentionally left blank ...
Page 259: ...2NP 1 3 162 U486 Details on the modes Figure 1 3 47 Item No Description ...
Page 473: ...2NP 1 5 62 This page is intentionally left blank ...
Page 497: ...2NP 2 1 22 This page is intentionally left blank ...
Page 555: ...2NP 2 3 48 This page is intentionally left blank ...
Page 584: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 620: ...DP 773 Document processor Installation Guide ...
Page 646: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 654: ...PF 810 3000 sheets deck Installation Guide ...
Page 667: ...DF 770 D Document finisher Installation Guide ...
Page 685: ...AK 740 Bridge unit Installation Guide ...
Page 687: ...PH 7A C D Punch unit Installation Guide ...
Page 708: ...DT 730 B Document tray Installation Guide ...
Page 710: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 711: ...FAX System W B Installation Guide ...