2NP
1-4-54
8100
DF eject release motor error
When the DF eject release
motor is driven, DF bundle
discharge sensor does not
turn on within 1 s.
DF eject release
motor
DF bundle
discharge unit
sensor
1. Execute Motor - Eject Unlock (Full) of
U240 finisher operation check (see page
1-3-103).
2. Check that the eject guide of the
process tray is opened and, if not, cor-
rect the guide.
3. Check that the drive from the motor
reaches the eject guide.
4. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
DF bundle discharge unit sensor and DF
main PWB (YC20)
5. If the wiring is disconnected, shorted or
grounded, replace the wiring.
6. Replace the DF eject release motor.
DF bundle
discharge unit
sensor
1. Execute Finisher - Bundle Eject HP of
U241 finisher switch check (see page 1-
3-105).
2. Check that the sensor and its mounting
board are correctly positioned.
3. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
DF bundle discharge unit sensor and DF
main PWB (YC20)
4. Replace the DF bundle discharge unit
sensor.
DF main PWB
Replace the DF main PWB (Refer to the
service manual for the document finisher).
Code
Contents
Causes
Check procedures/
corrective measures
Summary of Contents for TASKalfa 2551ci
Page 1: ...SERVICE MANUAL Published in September 2016 842NP11A 2NPSM06A Rev A TASKalfa 2551ci ...
Page 10: ...This page is intentionally left blank ...
Page 97: ...2NP 1 1 2 74 This page is intentionally left blank ...
Page 259: ...2NP 1 3 162 U486 Details on the modes Figure 1 3 47 Item No Description ...
Page 473: ...2NP 1 5 62 This page is intentionally left blank ...
Page 497: ...2NP 2 1 22 This page is intentionally left blank ...
Page 555: ...2NP 2 3 48 This page is intentionally left blank ...
Page 584: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 620: ...DP 773 Document processor Installation Guide ...
Page 646: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 654: ...PF 810 3000 sheets deck Installation Guide ...
Page 667: ...DF 770 D Document finisher Installation Guide ...
Page 685: ...AK 740 Bridge unit Installation Guide ...
Page 687: ...PH 7A C D Punch unit Installation Guide ...
Page 708: ...DT 730 B Document tray Installation Guide ...
Page 710: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 711: ...FAX System W B Installation Guide ...