3-3-9
1AH
(2-3) Removing the SB upper paper feed pulley
Procedure
1. Removing the SB paper feed unit. (see page 3-3-7)
2. Remove the stop ring and remove the bushing in front of the SB forwarding pulley
retainer in the direction of arrow
1
.
3. Push the bypass solenoid lever in the direction of the arrow
2
and remove the SB
forwarding pulley retainer from the SB paper feed unit in the direction of the arrow
3
.
SB forwarding pulley
retainer
Bushing
Bypass solenoid
lever
Stop ring
2
1
3
Figure 3-3-9
Summary of Contents for DC-2060
Page 1: ...SERVICE MANUAL Published in Oct 99 841AH110 DC 2060 2560 DC 2060 2560...
Page 2: ...Service Manual DC 2050 2560...
Page 4: ......
Page 13: ...1AH MCE THEORY AND CONSTRUCTION SECTION I I Theory and Construction Section...
Page 14: ...1AH 1 1 Specifications 1 1 1 Specifications DC 2560 1 1 1 1 1 4 Specifications DC 2060 1 1 4...
Page 24: ......
Page 30: ...1AH 1 3 6 1 2 3 4 5 6 7 8 9 0 1 3 3 Drive system Figure 1 3 6 Drive system copier...
Page 82: ...1AH MCE ELECTRICAL SECTION II II Electrical Section...
Page 83: ...1AH 2 1 Electrical Parts Layout 2 1 1 Electrical parts layout 2 1 1...
Page 84: ......
Page 94: ......
Page 105: ......
Page 124: ...1AH MCE III Set Up and Adjustment Section III SET UP AND ADJUSTMENT SECTION...
Page 126: ......
Page 151: ......
Page 177: ...1AH This page is intentionally left blank...
Page 185: ...1AH This page is intentionally left blank...
Page 209: ......
Page 259: ...3 3 50 1AH Figure 3 3 59 Secondary mirror inclination adjustment screw Secondary mirror...
Page 351: ......
Page 357: ......